Global Footprint

Four markets across three continents

NOVA's four markets: United States, India, Croatia and the Republic of Korea.

World map of NOVA project locations. Marker details are also listed as text below the map. Lufkin campus Gujarat colocation data center Croatia AI data center Wonju Tongyeong Yeongheung Samcheok

Select a marker for details. Drag to pan, Ctrl/⌘ + scroll to zoom, or use the buttons; arrow keys and + / − work when the map is focused.

Select a marker to see its project details, capacity and status.

  • Under development
  • In discussions / contract negotiations
  • Pipeline — under discussion

Markers show city- or region-level locations only (India: state; Croatia: country). No marker is an operating facility; none of these projects is shown as delivered capacity.

Korean pipeline. The deck describes a ~4GW Korean pipeline: Wonju 250MW (scalable to 500MW), plus ~3.5GW converting retiring thermal power sites (Tongyeong 1GW · Yeongheung 1.5GW · Samcheok 1GW) into renewables-based BTM generation and data centers, under discussion with leading global data center operators and two KEPCO GENCO subsidiaries. It is separate from, and not part of, the 655 MW delivered figure.

Texas · Lufkin · ERCOT

United States

In Discussions

110 MW

Lufkin campus

Texas · Lufkin · ERCOT

110MW campus in Lufkin. In discussion with a major NeoCloud provider, alongside battery storage and energy infrastructure projects.

Discussion stage only; no executed customer agreement is stated in the deck.

Colocation

India

Under Development

300 MW

Gujarat colocation data center

Gujarat

300MW colocation data center in Gujarat, developed via JV with a local energy partner.

Marker shows the state, not a site.

AI Data Center

Croatia

In Discussions

Up to 400 MW

Croatia AI data center

Croatia

Site with capacity of up to 400MW, strong interest from a global AI infrastructure provider secured. LOI discussions starting.

Potential capacity ("up to"). Interest received is not a signed agreement. Marker shows the country, not a site.

Hyperscale AI Data Centers

Republic of Korea

Under Development

More than 1 GW

Korea: two sites

Republic of Korea

Two sites totalling more than 1GW, including 250MW in Wonju.

Second site is not named in the deck, so it is not mapped.

In Contract Negotiations

250 MW

Wonju

Wonju, Republic of Korea

250MW in Wonju in contract negotiations with a global anchor tenant. Scalable to 500MW.

Under negotiation; not an executed contract.

Korean pipeline — retiring thermal power sites (~3.5GW)

Part of the ~4GW pipeline described in the deck: Wonju 250MW (scalable to 500MW) plus ~3.5GW converting retiring thermal power sites into renewables-based BTM generation and data centers. Pipeline is separate from, and not part of, the 655 MW delivered figure.

Pipeline — under discussion

1 GW

Tongyeong

Tongyeong · retiring thermal power site

Conversion of a retiring thermal power site into renewables-based BTM generation and data centers.

Under discussion with leading global data center operators and two KEPCO GENCO subsidiaries (stated for the ~4GW Korean pipeline as a whole).

Pipeline — under discussion

1.5 GW

Yeongheung

Yeongheung · retiring thermal power site

Conversion of a retiring thermal power site into renewables-based BTM generation and data centers.

Under discussion with leading global data center operators and two KEPCO GENCO subsidiaries (stated for the ~4GW Korean pipeline as a whole).

Pipeline — under discussion

1 GW

Samcheok

Samcheok · retiring thermal power site

Conversion of a retiring thermal power site into renewables-based BTM generation and data centers.

Under discussion with leading global data center operators and two KEPCO GENCO subsidiaries (stated for the ~4GW Korean pipeline as a whole).